How many bags of fast-setting concrete per post?

About 3 bags, with a waste allowance included.

Change the numbers to match your project

Bags of mix, whole job 3 bags Rounded up. Buy one spare per ten posts, not per post.
Concrete per post 0.89 cu ft
Concrete, whole job 0.89 cu ft
Same volume in cubic yards 0.03 cu yd
Volume the posts displace 0.15 cu ft Already subtracted above. A plain hole-volume figure leaves this in.
Gravel for the drainage bases 0.27 cu ft

Water is the half of this order you have to carry yourself.

QUIKRETE's post-setting walkthrough for the dry method is specific about the quantity: "Pour about a gallon of water per 50 lb bag into the hole and allow the water to saturate the concrete mix." Three bags a post across a twenty-post fence is sixty gallons — twelve five-gallon buckets, or a hose that reaches. Nobody sells you that at the till, and it is the thing that stops the job.

That gallon is also roughly double what the same sack drinks in a mixer. The No. 1004 sheet gives "approximately 4 pt (1.9 L) of potable water" per sack and adds that "maximum water is expected to be below 5 pt (2.3 L)". Those are not measuring the same thing — one is water in a drum, the other is water poured into a hole whose soil takes a share — so do not carry either one across to the other method.

"Sets in 20 to 40 minutes" is a setting time, not a strength. That number is ASTM C191, the Vicat needle. Strength is ASTM C39, and the same sheet prints it separately: 1,000 psi at 24 hours, 2,500 psi at 7 days, 4,000 psi at 28 days. QUIKRETE's own instruction is to "Wait about 4 hours to begin constructing your fence or applying heavy weight to your post." The fast mix buys you the bracing, not the fence.

Check the sack against the bag list above. No. 1004 is sold as 50 lb and 60 lb in the United States and as 25 kg and 30 kg in Canada only, and the sheet yields those at 0.41 and 0.5 cu ft. A 30 kg sack holds a third more than the 50 lb bag this page assumes, so the same hole comes out at fewer bags — and a part-used sack of fast-setting mix does not keep once it has met water.

Open the full concrete calculator for post holes for other sizes and the full explanation →