How much concrete for a mailbox post?
About 1 bag, with a waste allowance included.
- 0.36 cu ft — concrete per post
- 0.36 cu ft — concrete, whole job
- 0.01 cu yd — same volume in cubic yards
- 0.11 cu ft — volume the posts displace
- 0.17 cu ft — gravel for the drainage bases
Change the numbers to match your project
Every other hole on this page gets deeper when you want it to hold better. This one has a ceiling on it, written by the Postal Service.
USPS publishes four figures for a curbside box, and two of them decide the concrete. "Bury your post no more than 24″ deep." And: "Position your mailbox 41″ to 45″ from the road surface to the bottom of the mailbox or point of mail entry." The support is specified as well — "A 4″ x 4″ wooden support or a 2″-diameter standard steel or aluminum pipe" — together with the warning that follows it: avoid "unyielding and potentially dangerous supports, like heavy metal pipes, concrete posts, and farm equipment."
That ceiling is a crash rule, not paperwork. The Postal Service's own bulletin credits the Federal Highway Administration with the dimensions, on the grounds that a support of that size and depth "should safely break away if struck by a vehicle", and adds that the box "must also be securely attached to its post to prevent separation if struck." You are building something designed to lose an argument with a car.
So the depth field is a maximum here, not a target. The one-third rule and the frost line, which govern every fence post, both push the other way. Where your frost line is deeper than 24 in you cannot honour both, and 24 in is the one with a federal reason behind it. A heaved mailbox is a nuisance; a mailbox set like a gate post is a bollard at windscreen height.
What the ceiling costs in concrete: about a third of a cubic foot. An 8 in hole 24 in deep, less the 6 in gravel base, the 3 in of soil backfill and the post, leaves roughly 0.36 cu ft — one 80 lb bag, a little over half used. The identical 4x4 in a fence, at 10 in by 30 in, takes two.
Add the two published limits and the post length falls out: 24 in below grade plus 41 to 45 in up to the floor of the box is 65 to 69 in, so a 6 ft 4x4 is the buy, standing 3 to 7 in proud for the mounting board. Treat that as approximate — the 41 in is measured from the road surface, while the post is 6 to 8 in back from the curb, where the ground normally sits higher.
Open the full concrete calculator for post holes for other sizes and the full explanation →
Last reviewed